API Q1 standard 9th edition - Summary of changes

작성자유문종|작성시간16.02.12|조회수53 목록 댓글 0

API Q1 standard 9th edition now released from API. 

This new standard shall be in effective from June 1 2014. Instead of 8 chapters and one Annexure of 8th edition now it is 6 chapters and 3 annexures. 

There are new requirements in the form of Risk assessment and Management, Contingency Plan, Preventive Maintenance, Management of change, Product quality if specified by the contract etc.

The facts

  • Approximately 93 additional requirements were added in the new revision
  • Legal is mentioned 19 times instead of 1 in 8th edition
  • Documented Procedures 27 instead of 13 earlier
  • 228 shall clauses instead of 213 from 8th edition

The task

  • Quality manual to be revised by addressing each requirement of this specification
  • Almost all the procedures shall be affected by this change
  • New forms shall be in place to address the changes
  • The workforce must be trained with the new requirement

Summary of changes briefed below

Clause noNew requirements from 9nth Edition
4.1.5.1 bData analysis result communicated within the organization
4.1.5.2 dQuality plans and changes  
4.2.3.cMR to Initiate actions to minimize nonconformance
4.3.2.2Records of Competency Determination
4.3.2.3 bEnsure that customer specified training and/or customer-provided training when required. Is included in the training program
4.4.1 b 3Identification of processes requiring validation
4.4.1 eLegal and other applicable requirements
4.4.2Procedures in place of control features
4.4.3 dProcedures, work instruction and forms controlled
5.2.cAddress legal requirement
5.2 dAddress contingencies based on risk assessment
5.2 gAddress management of change
5.2Planning output updated with changes
5.3Risk assessment and Management
5.4.6Completed designs approved after validation
5.5Contingency Planning
5.6.1.1 aPurchasing Determine Criticality
5.6.1.1 cType and extend of control over supplier based on criticality
5.6.1.1.eMaintain list of approved supplier and supplier scope
5.6.1.2Criteria for initial eval‎uation of critical suppliers
5.6.1.2 bAssessment by first article inspection, or how identifying product conforms to legal or contractual requirements
5.7.1.1 cEnsure design requirements and related  changes are satisfied where applicable
5.7.1.1 fProcess control documents
5.7.1.2 dEnsure identification and traceability maintained
5.7.1.4Maintain evidence of capability to meet product requirements
5.7.2Product quality plan
5.7.6.2Use of designated store area, assessment of stock at specified intervals and records of assessment maintained
5.7.7.3Final inspection based on plan or procedures to validate and document results
5.7.8Preventive Maintenance
5.11Management of Change
6.2.1Customer satisfaction records maintained
6.2.2.1Onsite outsourced activities subject to internal audits
6.2.2.2QMS Processes audited  before claiming conformance to this specification
6.3Analysis of data shall consider information on nonconformities and on objectives
6.5.2Management review minutes inputs to include process performance, result of risk assessment and supplier performance analysis
4.4.2Procedures in place of control features
4.4.3 dProcedures, work instruction and forms controlled
4.5Reports including outsourced activities provide evidence of conformity
5.4Controls for other organization design locations impacting design
5.4.3 dDesign & Dev output Critical products or components
5.6.1.3Initial supplier eval‎uation noncritical purchases meeting the requirement 5.6.1.2 or other requirements